The Woonsocket School Board will hold a public meeting during its regular scheduled meeting on Tuesday, May 9, at 6 p.m. in the Library.
There will be a presentation by G&R Controls, Inc. of Sioux Falls on a new gymnasium boiler system. After the presentation, there will be time for community input and discussion.
The gymnasium/armory steam boiler is 55 years old and needs to be replaced, mostly due to inside deterioration. The boiler, which runs on fuel oil, delivers steam heat throughout the 1962 armory building. It also separates and condenses steam to hot water, which is then pumped to the elementary addition.
The school board approved G&R Controls last fall to investigate possible solutions. The most efficient form of heating discussed was geothermal with the possibility of utilizing Lake Prior. The rough estimate was 1.4 million.
The next G&R proposal was to replace the steam boiler with two smaller propane hot water boilers. All the current steam piping under the armory would have to be replaced to handle the new hot water system. The proposal added a LP gas tank farm to be able to purchase large quantities at a cheaper rate. The new system would also have the capability to switch and run on electricity depending on the lowest utility rates. The rough estimate for this system was $750,000.
Lastly, installation of roof top units was discussed and G&R recommended that the cost would be quite expensive and with very limited options for the elementary building. For one reason, the ceiling to rooftop height in the elementary is too low for the size of ductwork needed.
After much investigation and consideration to what other schools were doing in similar situations, the school board requested a new proposal from G&R controls. This included replacing the old boiler with two new propane steam boilers and utilizing the existing steam pipes and condenser. This proposal will basically just connect the two new smaller propane boilers to our current system. If one of the boilers fails in the future, the other boiler could run both the gym and elementary to keep everything heated until the problem is fixed.
We also recommended to switch from fuel oil to propane, which would make the system more efficient. This includes adding the LP tank farm and the option to switch the system to electricity that was previously proposed.
The intention of the new proposal is a more practical solution for the school and community of Woonsocket. The timeline for a new heating system is: 1.) Approving a final proposal this summer; 2.) Allowing G&R to draw up plans in the fall; and 3.) Bid in late winter for the project to be completed during the summer of 2018.
The public is invited to the presentation on May 9 so all concerns and questions can be answered. You can also contact Supt. Rod Weber at 796-4431 about the project.
-
Weather
Failure notice from provider:
Connection Error:http_request_failedUpcoming Events
May 2024 SSunday MMonday TTuesday WWednesday TThursday FFriday SSaturday 28April 28, 2024 29April 29, 2024 30April 30, 2024 1May 1, 2024 2May 2, 2024 3May 3, 2024 4May 4, 2024 5May 5, 2024 6May 6, 2024 7May 7, 2024 8May 8, 2024 9May 9, 2024 10May 10, 2024 11May 11, 2024 12May 12, 2024 13May 13, 2024 14May 14, 2024 15May 15, 2024 16May 16, 2024 17May 17, 2024 18May 18, 2024 19May 19, 2024 20May 20, 2024 21May 21, 2024 22May 22, 2024 23May 23, 2024 24May 24, 2024 25May 25, 2024 26May 26, 2024 27May 27, 2024 28May 28, 2024 29May 29, 2024 30May 30, 2024 31May 31, 2024 1June 1, 2024 -
Recent Posts
Contact Us
Archives
Tweet