Woonsocket School Board proceedings

UNAPPROVED MINUTES – SPECIAL MEETING HELD JANUARY 17, 2018 

The Woonsocket Board of Education met in special session on January 17th, 2018, at 6:00 p.m. in the Commons Area of the Woonsocket School.  Members attending were: Jason White, Lisa Snedeker, Todd Olinger, Jodi Doering and Neal Hiemstra.  Others attending were Superintendent Rod Weber, Paula Lynch, Representative Chris Brockevelt from Koch-Hazard Architects and Representative Paul Doohen of G&R Controls, various interested parties in the bid process for the elementary addition project, and Chris Selland. The meeting was called to order at 6:00 p.m.

On a motion by Lisa Snedeker, seconded by Jodi Doering, the Board approved the meeting agenda as presented.   Motion carried.

Motion was made by Jodi Doering, with a second by Todd Olinger, to approve Koch-Hazard Architects/G&R Controls to run the bid opening for the Woonsocket Elementary Addition project with possible motions to follow.  Motion carried.

Bids were opened and tabulated as follows:

G&R Controls: G&R Controls (Design/Build Contractor bids – electrical, plumbing, mechanical), Base bid $213,199.00, Alternate #1 (sink) $1,078.00, Total with alternate $214,277.00; *Westendorf Electric – included in base bid; *Krohmer Plumbing  –  included in base bid; *Beate-Forseth (HVAC.) – included in base bid; *indicates low bid received by G&R Controls.

Because G&R Controls had been selected as the Design/Build Contractor  through the request for proposals process, they were entitled to the above contract and were responsible for receiving bids from the subcontractors as listed above.

Koch-Hazard Architects (General Contractor bids – architectural, structural, civil) – Base bid, Alternate #1 (floor tile), Total with alternate:

Complete Contracting $632,155.00, $19,801.00, $651,956.00;

Sunkota $565.000.00, $13,000.00, $578,000.00;

Tellinghuisen $563,000.00, $11,100.00, $574,100.00;

Mueller Lumber, $654,900.00, $13,300.00, $668,200.00.

All bidders provided the necessary bond required and the four addendas.

Other required costs for the project that the District would be directly responsible for include:

Architect Fees (payable to Koch-Hazard): $33,700.00;

Consultant Fees for mechanical eng. (payable to Associated Cons. Engineering): $10,500.00;

Estimated construction testing (payable to Geotek): $15,000.00;

Possible estimated asbestos abatement –  (payable to Snow & Associates): $2,000.00;

Total additional costs for the project: $61,200.00.

This would bring the total project cost as planned with both alternates to $849,577.00.

Motion was made to approve a special board meeting on Monday, January 22, 2018, at 7:30 p.m. in the Distance Learning room of the Woonsocket School. The purpose of the meeting is to discuss the financing options regarding the elementary addition project now that the bids have been received. Motion carried.

Motion was made by Jodi Doering, with a second by Todd Olinger, to approve Schoensfish, Inc., to perform the 2016-2017 school year audit. Motion carried.

It was moved by Todd Olinger, with a second by Jodi Doering, to approve wrestling official pay of $125.00 plus mileage to Clark Slykhuis for the January 25th, 2018, wrestling match to be held in Woonsocket. Motion carried.

There being no further business to come before the Board, the January 17, 2018, special board meeting of the Woonsocket Board of Education was adjourned at 6:39 p.m. on a motion by Neal Hiemstra, with a second by Jodi Doering. Motion carried.

JASON WHITE

Chair

CRYSTAL A. SELLAND

Business Manager

Comments are closed.

  • Weather

    Failure notice from provider:
    Connection Error:http_request_failed
  • Upcoming Events

    July 2024
    Sunday Monday Tuesday Wednesday Thursday Friday Saturday
    June 30, 2024 July 1, 2024 July 2, 2024 July 3, 2024 July 4, 2024 July 5, 2024 July 6, 2024
    July 7, 2024 July 8, 2024 July 9, 2024 July 10, 2024 July 11, 2024 July 12, 2024 July 13, 2024
    July 14, 2024 July 15, 2024 July 16, 2024 July 17, 2024 July 18, 2024 July 19, 2024 July 20, 2024
    July 21, 2024 July 22, 2024 July 23, 2024 July 24, 2024 July 25, 2024 July 26, 2024 July 27, 2024
    July 28, 2024 July 29, 2024 July 30, 2024 July 31, 2024 August 1, 2024 August 2, 2024 August 3, 2024
  • Recent Posts

  • Contact Us

    Ph/Fax: 605.796.4221
    Email: swj4221@icloud.com

    PO BOX 218
    Woonsocket, SD 57385
  • Archives